Manor Vevey: Renovation of a Low Voltage Main Distribution Board (MDB)
Discover how Alps Group renovated Manor Vevey’s MDB to ensure the shopping center's electrical safety and energy efficiency.

Context
With increasing activity and electrical demands, Manor Vevey needed to upgrade its power supply capacity. A study revealed the necessity for new transformers and a modernization of the Low Voltage Main Distribution (MDB).
Romande Énergie installed five new transformers, providing a total capacity of 5,750 kVA, while Alps Group managed the MDB renovation to meet the center’s current energy needs.
TGBT Renovation Objectives
Ensure electrical safety and energy efficiency.
Maintain uninterrupted operations in a constantly evolving environment.

Implementation
Alps Group managed the complete integration of the new MDB, with key steps including:
- Electrical studies and load calculations to define installation requirements
- Designing schematics and manufacturing switchboard units using Schneider Electric solutions
- Extensive in-house testing to ensure system reliability
- Delivery, on-site installation, and coordination with all stakeholders for a seamless commissioning process
Thanks to these efforts, Manor Vevey now benefits from an optimized power supply, fully compliant with safety standards and ready for future demands.